warning signTRAFFIC ALERT - BEGINS 10/23/18 - ROAD CLOSURE 100 BLOCK OF WASHINGTON ST. (DELAYED DUE TO WATER MAIN BREAK) warning signTRAFFIC ALERT - BEGINS 06/18/18 - 4TH STREET AT RIVER ROAD FOR MSD SEWER REPAIR WORK warning signTRAFFIC ALERT - BEGINS 04/11/18 - MAIN STREET BETWEEN 4TH AND 7TH warning signTRAFFIC ALERT - BEGINS 2/26/18 - FIRST ST. BETWEEN WASHINGTON & MAIN warning signTRAFFIC ALERT - BEGINS 2/26/18 - CLARK MEMORIAL BRIDGE LANE CLOSURES warning signTRAFFIC ALERT - BEGINS 2/19/18 - LANE CLOSURE 4TH STREET BETWEEN CHESTNUT AND GUTHRIE warning sign

Downtown Louisville Traffic Alert

Traffic Alert – Issued 07/26/18

Expired
07.30.18

Traffic Alert

JULY 30 - NOV. 30DOWNTOWN LANE CLOSURES Main St. from 3rd St. to 7th St.
AND
4th, 5th, 6th, and 7th Sts. at Main St.

Date(s) In Effect: July 30, 2018 12:00 am - November 30, 2018 12:00 am

This traffic alert has expired.

DOWNTOWN LANE CLOSURES

FRIDAY JULY 30th, 2018 – NOVEMBER 30th, 2018

MSD will be conducting sewer line work to make a connection for the Waterway Protection Tunnel, resulting in lane closures on Main Street from 3rd Street to 7th Street, and closures on 4th, 5th, 6th, and 7th Streets.

LOUISVILLE, KY — Both Fifth and Sixth streets in the Main Street area will have lane reductions as part of sewer line work to make connections for MSD’s Waterway Protection Tunnel. Access to all parking garages in the area will be maintained.

Additionally, Fourth Street will reopen to northbound only traffic on August 6. It will remain northbound through November 30.


WHEN and WHERE:

July 30 – November 30, 2018 Fifth Street will have one northbound lane between Main and Market streets beginning July 30 and remain one lane through November 30, 2018.

Access to the Fifth Street entrance of the PNC Tower Garage and ATM will remain open during the lane reduction.

Sixth Street will have one southbound lane between Main and West Washington streets beginning August 6, and remain one lane through November 30, 2018.

Patrons will access the Kentucky Center for the Performing Arts Garage, Muhammad Ali Center Garage and the Riverfront Garage on Sixth Street via River Road.

MORE ON THE PROJECT: The sewer line work on Sixth and Fifth streets in the Main Street area will allow the capture of sewer overflow points that currently discharge to the Ohio River. The sewer lines are part of MSD’s Waterway Protection Tunnel project.